Skip To Main Content

Hough Elementary

An estimated $2.9 million out of the $147 million referendum will be spent at Hough Street Elementary, which includes all construction costs and non-construction items such as safety and security, furniture and technology. Key projects include: 

  • Building a new classroom addition which will include a sensory space for students with special needs and resource rooms 
  • Renovating the library to include a STEM space 
  • Installing handicap accessible ramp to front entrance

 
Construction at Hough began in Summer 2022 and is anticipated to wrap up in the winter during the 2022-23 school year. 

 

Photos & Renderings
New addition

A new addition is being built on the west side of the building, which will house a sensory room and resource rooms. (Photo: June 2022) 

STEM

The Hough library is currently under construction as crews build a new STEM space for students. (Photo: June 2022) 

Sensory room

Rendering of a sensory room which will be located in the new addition on the west side of the building. 

STEM

Rendering of a STEM space which is being built next to the current Hough library. 

New addition exterior

Exterior rendering of the new addition on the west side of the building.