Design

      • The Design phase at the ELC is scheduled to take place from January 2022-September 2022. 

      Bid

      • The Bid phase at the ELC is scheduled to take place from October 2022-November 2022. 

      Build

      • The Build phase at the ELC is scheduled to take place from December 2022-October 2023. 

      • ELC Projects